I-84 Baldock Slough Baker Interchange Section

Bridge Repair

​Upper Chetco

​Salmonberry​

NE 21 Street


City of Portland Project consisting of raising existing bridge and removing interior bents and replacing with steel pile supported concrete caps.

Steven's Canyon


Steven's Canyon project consisted of the repair of  five historic bridges and two tunnels in beautiful Mount Rainier National Park. The joints in the tunnels were sealed to stop water from leaking through the joints and eroding the soil behind. The bridge repairs consisted of epoxy overlays, removal and replacement of deteriorated concrete, replacement of expansion joints, crack injection, re-painting existing rails, and sealing of concrete surfaces.  

Legacy Contracting, Inc.

Tel: (503) 749-1818

41850 Kingston-Jordan Rd, Stayton, OR 97383

Region 3 Bridge Repair


​Work consisted of repairing five bridges with live traffic. This included lifting the bridges and replacing the bearings without interrupting I-5 traffic above.